Procore is a construction system of record, and its drawing tool is a capable one. Drawing sets upload in bulk, a comparison overlaps two revisions and highlights what changed, markups carry forward from one revision to the next, measurements calibrate against a length you know, and a drawing links to the RFIs, submittals, punch items and observations around it. The field apps work offline. Procore says it does not charge for the people you add, including clients, subcontractors and vendors.
Xenmark runs one job end to end: a drawing set goes out for review, comments come back against the revision they were raised on, and the review finishes as two documents — a plan showing where each comment sits, and a spreadsheet saying what each one means, numbered to match.
Procore is bought as a platform, with an upfront annual fee by product against the value of the construction work you have on. If you run construction projects that is the point of the thing, and if your subscription already covers the Drawings work you need, the review adds nothing to the bill. Choose Xenmark when the job is the review itself — one set of drawings, out and back, ending in a numbered plan and a matching register. A free Xenmark project may be all you need for the review.
A Xenmark comment owns its markers, its number and its thread. In Procore a markup carries none of those — the number, the replies and the status live on a separate Observation pinned beside it, and the register exports from there while the marked-up plan comes out of Drawings. Both products can produce the plan and the spreadsheet; only one treats them as the same object.
A Xenmark comment number is fixed, so item 12 still means item 12 in every email and every export. Procore sets an Observation number from the count of observations created, then says plainly that you may edit it. That number is what ties the register back to the plan, and it is a field a person can change.
The whole of Xenmark is the review: drawing set, revision, numbered comment, handover. Nothing to configure and nothing to adopt. A free project takes a real set from upload to exports, and the price of the paid plans is on the page — where Procore publishes no figure at all and quotes against your annual construction volume.
Every Procore Drawings claim below is taken from Procore Drawings's own published material and was last checked on 26 August 2026. Software changes; if something here is out of date, tell us and we will correct it.
Several things to say plainly before the table. Procore overlaps two revisions and highlights what changed between them, compares a whole set in bulk, and can apply the markups from a previous revision to a new one — none of which Xenmark does at all. It measures distance, area and freehand shapes against a calibration you set. Drawing sets upload in bulk with the number and title read off each sheet. The mobile apps work offline on site. A company logo appears on its reports. And Procore says it does not charge for the people you add — in its own words, “without limit” — which is a statement about billing, not about what those people are permitted to do.
It also produces both halves of the handover. A drawing download taken with published markup includes linked items, tagged and hyperlinked; an Observations export carries the number, title, assignee, dates, status, priority and location as CSV or PDF. The difference is not whether the documents exist. It is that they come out of different tools, and the thing joining them is a record number that Procore says you may edit.
The measurements come out too. A separate Measurements Report gathers them across the project’s drawings and writes PDF or CSV. Because measurement markups cannot be published, that report covers the measurements you added rather than the team’s, and Procore calls the values approximate. Xenmark puts measured values on their own sheet inside the same Excel file as the comments, so the difference is one document or two — not whether the numbers can leave the drawing.
One narrower gap. Linked Drawings appears in the PDF-with-photos export rather than in the CSV, so the spreadsheet names the location rather than the sheet.
| Xenmark | Procore Drawings | |
|---|---|---|
| Starting a review | ||
| Can the person running the review start free? | Yes — the Free plan runs one active review at a time, start to finish | No free plan is published, and no price is either. Procore quotes an upfront annual fee by product, against your Annual Construction Volume, and the route to a figure is a demo or a call with sales. |
| Do external reviewers need a paid subscription? | No — the people you invite read, reply and download the exports without paying | No, and Procore is emphatic about it — “unlimited users, including not just your employees, but all other collaborators like clients, subcontractors, and vendors”. What each person may do is set by role, as it is with us: a markup needs Read Only or above, and publishing one where others can see it needs Standard or Admin. |
| Available platforms | Any modern browser — nothing to install, and the people you invite join from a link | Broader than ours — browser, plus iOS and Android apps built for site work, with offline access |
| How the review is structured | ||
| What the review is built from | A numbered comment. Anything drawn on the page belongs to that comment rather than standing on its own. | Two objects, not one. A markup sits on your personal layer until you publish it, and carries no number, no reply and no status of its own. The numbered, threaded, status-carrying thing is a separate record — an Observation, punch item or RFI — pinned to the drawing beside it. |
| Replies | Threaded under the comment, each attributed and dated, with image attachments, and carried into the register | Yes, on the record rather than on the markup. An Observation takes comments and keeps an activity stream, and email goes out when somebody comments or changes its status. |
| Status workflow | Open, In progress and Closed — three fixed states, and the status travels into the Excel register | Yes, and it shows on the drawing. An Observation is Initiated, Ready for Review, Not Accepted or Closed, and the colour of its pin carries that status. Markups are personal or published rather than carrying one. |
| Comment numbering | Numbers are stable — delete comment 5 and the gap stays, so item 12 still means item 12 in every email and every export | Editable. An Observation number “will automatically populate with the next number based on the number of observations you and your team have created”, and Procore adds “You may edit this as needed”. Its guidance on repeats is inconsistent: the page on creating an observation says the number “can be a duplicate of one already assigned to another observation item”, while the page on editing one says a number already in use is refused until you pick an unused one. Markups carry no number at all. |
| One issue, several drawing locations | One comment can own several markers while keeping one number and one reply thread | A record is pinned at a location, and each link action places a single item — though an existing Observation can be searched for and linked, rather than a new one created. |
| Activity history | Every action timestamped and attributed to the person who made it | Yes — an Observation keeps an activity stream, and email notifications go out on a comment or a status change |
| Revision handling | Comments stay tied to the revision they were raised against, in one workflow | Stronger than ours. Procore keeps a drawing history, opens a comparison that overlaps the two revisions and highlights the changes — additions in blue, removals in red — and documents applying the markups from a previous revision to a new one. A whole set compares in bulk, returned as a PDF by email. We cannot compare two drawings at all. |
| Measuring and markup | ||
| Measuring on the drawing | Length, polylength, perimeter and area, calibrated to the page scale | Calibrate, Distance, Area and Freehand. Recalibrating recalculates measurements already placed. Procore’s own note is worth quoting: the measurements “are approximate and only appear on your Personal layer”. |
| Setting the drawing scale | Pick a standard scale, type your own, name the sheet size, or calibrate from a distance you already know | Calibrate from a length you know, entered in feet and inches or in metres, and recalibrate later — existing measurements are recalculated against the new one |
| Building your own reusable symbols | Check, cross, attention, arrow and cloud — five fixed review symbols, not a custom library | Markup tools cover pen, highlight, cloud, box, ellipse, arrow, line, text and pins. |
| Measuring quantities for pricing a job | Not included — measurements are there to explain a comment, not to cost work | Not part of Drawings — Procore sells Takeoff and Estimating as separate products |
| What comes out of the review | ||
| What you send back | The two documents come out ready to send — there is nothing to set up first, because the review was structured that way from the start | A drawing download carrying published markups and linked item tags, and a CSV or PDF register from the Observations or Punch List tool. Both exist, and they come out of different tools. |
| Comment plan PDF | The drawing with each comment numbered and shown where it applies | Yes. A download taken “With Markup” includes linked items, where “the tag for each item, such as ‘RFI 7’, will show as a hyperlink”, and the colour of each pin carries its status. From the Drawings log only published markups download; a personal layer comes out only by downloading that sheet from the viewer. |
| Spreadsheet output | An Excel file listing every comment, numbered to match the PDF | Yes, as CSV, out of the item tool rather than the drawing. An Observations export carries the number, type, trade, title, assignee, dates, status, priority and location. Linked Drawings appears in the PDF-with-photos export, not in the CSV — so the spreadsheet names the item and its location, and what ties it back to the plan is that record number. |
| Measurements in the export | Drawn on the comment plan PDF where they were placed, and listed on their own sheet in the Excel file, kept separate from the comments | Yes, through a separate report. Measurement markups cannot be published, so Procore notes “you can only view measurements you have added to drawings”, and it calls them approximate. A Measurements Report gathers your own measurements across the project’s drawings and exports them to PDF or CSV — a second document, beside the register rather than inside it. |
| What you keep when the project ends | A single zip file — every revision's exports, the attachments and the full activity log, downloaded and stored on your side | Procore is the record — unlimited data storage is stated in its pricing model, and drawings, markups and item logs export to PDF or CSV for as long as you have access. Since 21 July 2026 a Project Archive tool compiles and exports project data from across Procore’s tools as a downloadable ZIP, for closeout and compliance; which records it carries is set when you configure it. What you hold afterwards follows your contract. |
| Branded reports | Your company logo and text on both deliverables, inherited from Company Settings — Plus and Pro | Yes — a company logo uploaded to Procore appears on its forms and reports, and custom report templates export to XLSX, PDF or CSV |
| What else each one does | ||
| Batch operations across many PDFs | Not included — a review works on one drawing set at a time | Yes — a drawing set uploads in bulk with the drawing number and title read off each sheet, and the Drawings Log exports in one go |
| Comparing two drawings against each other | Not included — differences get raised as comments by the people reviewing | Yes — a comparison mode overlaps the two revisions and highlights what changed, and a whole set compares in bulk, returned as a PDF by email |
| Working offline | Browser only, so you need a connection | Yes, and this is a real strength — the mobile apps are built for site work, with offline access |
| Storing documents long term | Not what it is for. You download the exports and keep them wherever your project records already live. | Yes — this is what Procore is. A construction system of record, with unlimited data storage stated in its pricing model. |
| CAD integrations and creating PDFs from CAD | None — a review starts from a PDF that has already been produced | Drawings works from published PDF sets. Procore runs a wider integration marketplace. |
| Connecting to a document management system | No integrations yet — the closing archive is a single zip you file wherever your records already live | Yes, and well past that. A drawing links to RFIs, submittals, documents, punch items, observations, inspections and photos, and Procore runs an integration marketplace. |
A like-for-like price comparison is not available. Procore publishes no list price, no starting price and no per-user price: the fee is quoted by product, against your Annual Construction Volume, and you find out by talking to their sales team. Xenmark publishes its prices on the page, including VAT, and the Free plan runs a complete review without a card. Which of the two costs less for a given firm depends on which Procore products that firm buys and at what construction volume, and none of that is published.
| Xenmark | Procore Drawings | |
|---|---|---|
| Billing unit | Per project capacity, monthly | By product, against your Annual Construction Volume — the aggregate value of the construction work across your projects |
| Entry point | Free — one active review, start to finish, no card | No free plan is published. A demo, or a call with sales. |
| To run a review yourself | Free | A Procore contract. No public figure of any kind. |
| Paid range | €14.99 – €59.99 / month | Not published — no list price, no starting price, no per-user price |
| Invited reviewers | Free — no per-user charge; 5–30 project members depending on plan, and the person running the review is one of them | Free, and stated as a principle — “We’ll never charge you for adding more users to Procore”, collaborators included. Publishing a markup needs Standard or Admin permission. |
| Tax basis | Including VAT | Not published — by quote |
Xenmark — current as of 28 August 2026. Procore Drawings — checked 26 August 2026 against Procore’s published pricing page, which carried no price figure of any kind on that date. Everything in the column above is Procore describing its own commercial model rather than a quote, and a quote is the only way to obtain a number. Treat none of it as a price.
No free plan is published. Procore quotes an upfront annual fee by product, based on your Annual Construction Volume — the aggregate value of the construction work across your projects — and the way to a figure is a demo or a call with their sales team.
What is free is the people: Procore states it will never charge for adding users, and that includes clients, subcontractors and vendors. Xenmark Free runs one active review at a time from upload to exports, with no card and no time limit.
They never pay. Procore is explicit that users are unlimited and that adding more of them is never charged for. What varies is what each person may do: adding a markup needs Read Only or above, and publishing it where anybody else can see it needs Standard or Admin permission on the Drawings tool. Until it is published, a markup sits on that person's own layer.
Xenmark works the same way, by role rather than by bill. Invited people are free within your plan's member limit, and the Project Manager decides whether each one is a Participant, who replies and downloads exports, or an Editor, who creates comments and pins. That choice is available on every plan, including Free.
Yes, and this is worth knowing before you assume otherwise. A drawing download taken with markup includes the items linked to that sheet, where the tag for each one — such as "RFI 7" — appears as a hyperlink, and the colour of each pin carries its status. Taken from the Drawings log it carries the published markups; a personal layer comes out only by downloading that sheet from the viewer. An Observations export gives you the number, type, trade, title, assignee, dates, status, priority and location, as CSV or PDF.
Two differences remain. The documents come out of different tools rather than from one review, and Linked Drawings appears in the PDF-with-photos export rather than in the CSV, so the spreadsheet names the location rather than the sheet. And what joins the two is the record number, which Procore says you may edit. In Xenmark the plan and the register are produced together and numbered from the same comment, and the number is not editable at all.
Yes. Calibrate first from a length you already know, entered in feet and inches or in metres, then measure distance, area or a freehand shape. If you recalibrate later, the measurements you have already placed are recalculated against the new scale.
Procore adds a caveat of its own worth repeating: the calibrations, areas and distances "are approximate and only appear on your Personal layer". Because measurement markups cannot be published they never join the shared review — but they do come out. A separate Measurements Report collects the measurements you have added across the project's drawings and exports them to PDF or CSV. Xenmark measures length, polylength, perimeter and area against the page scale and puts those values on their own sheet inside the same Excel file as the comments, so the register and the measurements arrive as one document rather than two.
Better than Xenmark can, on the comparison side. Procore keeps a drawing history and opens a comparison mode that overlaps one revision on the other and highlights the changes — what was removed in red, what was added in blue. A whole drawing set can be compared in bulk, with the result emailed back as a PDF, and Procore documents applying the markups from a previous revision to a new one. Xenmark cannot compare two drawings at all — differences get raised as comments by the people reviewing.
What Xenmark does instead is tie the comment to the revision it was raised against, so the review history travels with the set from one issue to the next, and closing the project hands you one zip holding every revision's exports, the attachments and the activity log.
There is no way to answer that honestly. Procore publishes no price at all — no list price, no starting price, no per-user price — so there is no figure to compare against. The fee is quoted by product against your Annual Construction Volume, which means it is sized to the value of the work you have on rather than to a review.
What can be said is what each publishes. Xenmark is €14.99 to €59.99 a month including VAT, on the page, with a Free plan that runs a complete review. Procore gives you a demo and a quote. For a firm whose Procore subscription already covers the Drawings work it needs, the review adds nothing to the bill — though a Procore contract does not by itself mean Drawings is in it, because the fee is quoted by product. For a firm not on Procore, the comparison starts with a sales call on one side and a signup on the other.
No. Procore is a construction management platform — RFIs, submittals, punch lists, inspections, observations, photos, document control and the project record around them. Xenmark does none of that.
Xenmark covers the part where a drawing set goes out for comment and something structured has to come back. A firm running its projects on Procore should keep doing that. Xenmark is for the times when you need the review and not the platform.
When you run construction projects and want the drawings inside the project record, connected to the RFIs and submittals and punch items around them. When the work is on site and needs to hold up offline. When you need revisions compared or markups carried forward. When everybody on the job — staff, subcontractors, clients — has to be in the same system. And when the Procore subscription you already hold covers the Drawings work, so the review adds nothing to what you pay.
We sell Xenmark, so this is not an independent review. We have tried to describe Procore Drawings accurately, and every Procore Drawings claim on this page rests on Procore’s own published documentation. The documents are named below. Capabilities and pricing change. Procore Drawings feature information was last checked against that documentation on 26 August 2026, and the pricing on 26 August 2026.
Procore’s support site is linked, so almost every claim here can be checked against the source it rests on. The pricing page is named rather than linked, because it is a shopfront. One thing this page cannot source is a price: on the date checked, Procore published no figure of any kind, so no price comparison appears above and none should be added later from a third-party estimate.
The Free plan takes a real drawing set end to end. No card, no time limit.
Start free